Experience in Planning,
Institutional Development and Human Resources Development:
·
|
Institutional Development Expert in the following assignments:
·
CMWU Transfer Plan
Implementation Support Initiatives
·
Skills and Needs Assessment
and Development of a Training Program.
·
Preparation of Organizational
Structure and Transfer Plan for Coastal Municipalities Water Utility (CMWU).
·
Funded by: InfraMan GmbH,
employed to operate the Coastal Municipal Water Utility (CMWU). Year:
2007-2008
|
·
|
Development of Project
Management System For the Gaza Middle Area Municipalities. Funded by: Support
to Municipal Development and Management in the Middle Area Municipalities
(SMDM). Year: 2007
|
·
|
Instituional Development
Expert: Technical Assistance & Training of Palestinian Municipalities in
Gaza Strip (25 municipalities) – Local Government Capacity Building Project
(LGCBP), 2007-2008. Funded: by Municipal Development Fund (through the World
Bank and the Government of Netherlands).
|
·
|
Monitoring and follow-up of
the projects financed by the Islamic Development Bank, (issued by the Arab
League Summit donation to the Palestinian people). Including evaluation of
technical and financial progress of the projects.
|
·
|
Situation Analysis – Evaluation
and Re-Organization Study of the West Bank Offices. Funded by: Islamic
Relief, 2007
|
·
|
|
·
|
Feasibility Study for
Construction a Commercial and Residential Center in Gaza City. Client: Deewan
Qadi Al Quda.
|
·
|
- Policy Guidelines for
Sustainable Wastewater Mangement in the Gaza Strip. Part I: Legal and
Institutional Issues. LIFECY/99/GA/141. June 2002.
- Policy Guidelines for
Sustainable Wastewater Mangement in the Gaza Strip. Part II: Technical Issues
and Case studies. LIFECY/99/GA/141. June 2002.
|
·
|
Evaluation of the Poverty
Oriented Employment Generation Program through Economic and Social
Infrastructure Development, "TASHGHIL", (Community Development,
economic development, employment generation, agriculture, infrastructure and
institutional development). Client: The United Nations Development Program,
and funded by The United States Agency for International Development
|
·
|
Preparation of the Strategic
Plan for Qatar Charity development program in Palestine for 2007-2011.
Client: Qatar Charity
|
·
|
Establishing Information and
Communication Tele-Center (ICT) in Bait Lahia Municipality. Managed by
Palestinian Economic Council for Development and Reconstruction (PECDAR) and
funded by the World Bank
|
·
|
Organizational Analysis and
Capacity Building Needs Study of the Middle Area Municipalities.
Client: Middle Area Municipalities. Funded by SMDM- Denmark. June 2002.
|
·
|
The Study on Local Government
Finance in Gaza. Client: World Bank. Funded by World Bank. May 2002.
|
·
|
The Study on Local Government
Finance in Gaza. Client: World Bank. Funded by World Bank. April 2004.
|
·
|
Operational Support of Common
Service Council for Water and Wastewater Management in Northern Area. Client:
Common Service Council and PWA. Funded by SIDA. January 2001.
|
·
|
Working Group on Physical,
Fiscal and Institutional Damage at Local Government Level – Local Government
Finance Impact Consultancy in Gaza and West Bank. Prepared for The World
Bank. 2001
|
·
|
Three-Year Development and
Investment Plan for the Municipality of Rafah, Funded by World Bank, 2001.
|
·
|
Technical Study/Consultation
to Promote Organizational Development in the The Directorate of Fisheries.
Prepared for The Directorate of Fisheries. Funded by GFP/DANIDA. 2001
|
·
|
West Bank and Gaza
Inter-governmental and Municipal Finance Sector Study Report. World Bank,
2000.
|
Experience in Workshops
Management and Organization
·
EXPOTECH 2013 IT Conference.
Gaza, December 18, 2013. Moderator in the session of “ICT Employability and
Entrepreneurship Programs”.
·
Water Sector Strategic
Directions, Islamic University of Gaza, May 2005.
·
The Economical and Financial
Crisis facing the Palestinian Government – What is the Solution –by Minister of
National Economy, Organized by the Institute for Development Studies (IDS),
April, 2006.
·
Conference on the Impacts of
Palestinian Legislative Council Elections, Gaza, Institute for Development
Studies, February 2006.
·
Workshop on University –
Business Partnership, Islamic University of Gaza, April 2006.
·
Workshop on IUG Strategic
Planning, Islamic University of Gaza, April 2004.
·
Palestinian Contractors Union,
Unified Conditions of Contract, DAI, 2004.
·
Workshop on "Guidelines to
Increase Labor Intensity in Infrastructure Development Projects." Support
to Municipal Development and Management (Project) SMDM. September 2004.
·
Community Needs Assessment for
Information Technology Services in Bait Lahia, organized in cooperation with
Bait Lahia Municipality and PECDAR, World Bank Funded Project, August
2005.
·
Public Hearing to present and
consult the stakeholder regarding the outcomes of the Environmental Impact
Assessment of the Emergency Wastewater Treatment Project in the Northern Area,
Client PWA and World Bank Funded Project, May 2005.
·
Introductory Meeting with
Stakeholders, the Environmental Impact Assessment of the Emergency Wastewater
Treatment Project in the Northern Area, Client PWA and World Bank Funded
Project, November, 2004.
·
Workshop for contractors,
Investors, and representative of Governmental Organizations about the Impacts
of the Construction and Demolition Wastes in Gaza Strip, GTZ Funded the
project, April 2004.
·
Workshop to conduct SWOT
analysis (Strengths, Weaknesses, Opportunities and Threats) for the recycling
the Construction and Demolition Wastes sector in Gaza Strip, GTZ Funded the
project, April, 2004.
·
Workshop to present the
Outcomes of the feasibility study of recycling the Construction and Demolition
Wastes in Gaza Strip, GTZ Funded the project, August, 2004.
·
Community Needs Assessment
Workshops – Three Years Strategic Development Plan for Rafah Municipality –
Municipal Infrastructure Development Project, World Bank Funded project,
2003
·
Summary of the Islamic
Development Bank's Projects in Palestine (education, agriculture, health,
infrastructure, housing, industry, etc.). "the workshop presented the work
progress", (Ministers, Councilors, Projects Managers and about 400 Figures
attended the workshop), 2003.
·
Workshop on Prioritization of
Municipal Infrastructure Projects and Procurement according to the World Bank
Procedures (EMSRP-Project) at the Ministry of Local Government, Gaza, World
Bank Funded Project, 2004.
·
Force Majeure in Local
Contracts for Contractors, DAI Funded project, 2004.
·
Workshop to evaluate the First
Contractors Training Program which was funded by the Development Alternative
Inc. (DAI) using MetaPlan Technique, 2003.
·
Workshop to evaluate the Second
Contractors Training Program which was funded by the Development Alternative
Inc. (DAI) using MetaPlan Technique, 2004.
·
Workshop to present the
outcomes of the Environmental Management Plan of Gaza II Water Supply and
Sanitation project, Funded Through the PHRD Grant from the Japanese Government
for the Benefit of the Palestinian Authority through the World Bank.
·
Training needs and training
program assessments for water and wastewater sector (2000-2003). In
collaboration with the Islamic University of Gaza, Gaza Association of
Engineers and Carl Duisberg Gesellschaft e.V. (CDG).
·
Safety for Engineers at
Construction Sites – SMDM project in the Middle Area Governorate, 2001.
Experience in Geosythethetics /
Geotechnical and Constrcution Management (Team Leader):
·
|
Detail Service for Assisting
of Wastewater Lake at Biet Lahia (slope stability Analysis), Client:
Coastal Municipalities Water Utility, CMWU, Date: 2007, Funded by: United
Nations Children's Fund, UNICEF
|
·
|
Part-time – National Expert
for Construction and Demolition Wastes, Feasibility Study, Applications and
Management. Client: United Nations Industrial Development Organization
(UNIDO) December 2005- to date.
|
·
|
Assessment Study for the
Construction Wastes in Rafah and Khan Younis. Client: Italian Cooperation
|
·
|
Feasibility Study of
Recycling of Construction and Demolition Wastes (CDW). Client: GTZ
(German Technical Cooperation), Gaza, July 2004.
|
·
|
Appraisal of Al
Beirah-Ramallah Solid Waste Council and the National Strategy for Solid Waste
Management in Plaetine. Funded by GTZ, Gaza, August 2004.
|
·
|
Environmental Review for the
Construction of Additional Emergency Effluent Pond at Beit Lahia Wastewater
Treatment Plant , 2007. Client: PWA, Donor: American Near East Refugee Aid
(ANERA), USAID Funded Project
|
·
|
Environmental Assessment
study of North Gaza Emergency Sewage Treatment plant project. Client:
Palestinian Water Authority & World Bank, 2005.
|
·
|
Design and supervision of
Construction Works of the Cargo Terminal at Gaza International Airport
(TYPSA–Spain), International consultant, Client: Palestinian Civil Aviation
Authority, Date: 2004. the assignment included mainly Land surveying and
Geotechnical soil investigation, Funded by: European Commission.
|
·
|
Supervision of Extension of
Leachate Storage Pond and Pump House at Dier El–Balah Land Fill including the
analysis of slope stability and gabions of the leachate pond. Client:
Solid Waste Management Council (SWMC) & GTZ – Germany, Date: 1998 – 1999,
Funded by: GTZ – Germany
|
·
|
Supervision and Management of
Soil Investigation Project of Al Awda City, Gaza, Client, Al Awda Company.
|
·
|
A Laboratory Investigation of
the Role of Geosynthetics in Interrill Soil Erosion and Sediment Control,”
Geotechnical Fabrics Report, Apr. pp.16-33.
|
·
|
Soil Erosion by Rainfall and
Runoff- State of the Art,”Geotextiles and Geomembranes.
|
·
|
Soil Erosion by Rainfall and
Runoff- State of the Art,” Proceedings of the 5th GRI Conference on
Geosynthetics in Filtration, Drainage, and Erosion Control.
|
·
|
An Experimental Study of the
Effectiveness of Various Erosion Control Systems; Part II: Experimental
Results, Indianapolis, Indiana.
|
·
|
Environmental Training for
the Staff of the Ministry of Public Works and Housing. Client: The Ministry
of Public Works and Housing, World Bank Funded the project.
|
·
|
Preparing of Environmental
Management Plan (EMP) of The Emergency Water Project in the Southern Part of
the West Bank. Client: Palestinian Water Authority & World Bank
|
·
|
Preparing of Environmental
Management Plan (EMP) of The Emergency Municipal Rehabilitation Project
(EMSRP) for Gaza Strip and West Bank. Client: Ministry of Local Government
& World Bank
|
·
|
Environmental Impact
Assessment of Gaza II, Water supply and Sanitation Project. Client: The
Palestinian Water Authority and World Bank Funded Project
|
·
|
Evaluation of The Water and
wastewater Project in Alshabora, Al-Barazil and Hai Assalam in the
Municipality of Rafah: Institutional Management, Technical, Environmental
Health, and Community Participation Assessment. Client: Save the Children
Federation (SCF). Funded by DFID. December 2002.
|
·
|
Evaluation of The Water and
Sanitation Project at Jabalia: Institutional Management, Technical,
Environmental Health, and Community Participation Assessment. Client: Save
the Children Federation (SCF). Funded by DFID. Feb. 2002
|
·
|
Assessment and reviewing of
CDP micro-projects with World Bank and PECDAR. 2001.
|
·
|
Rafah Industrial Estate
Feasibility study, Planning Study and Environmental Impact Assessment 2000.
TSG Co. USA, Funded by USAID.
|
·
|
Reviewing and monitoring of
ERSP micro-projects with PECDAR and World Bank. 2001.
|
·
|
Assessment of Save the
Children Federation Projects by Rapid Assessment by Participation Method,
1998.
|
·
|
GAZA II Environmental
Management Plan, Client: World Bank, 2001.
|
·
|
Environmental Assessment –
Integrated Community Development Project, , Client: World Bank, 2001.
|
·
|
Environmental Assessment of
Trans-boundary Impact, Gaza Industrial Estate
|
·
|
Gaza Coastal Aquifer
Management project (CAMP), Environmental Assessment. 2000
|
·
|
Environmental Impact
Assessment on the Clinker Grinding Station, Gaza. 2000
|
·
|
Environmental Pollution
Monitoring. 1999-2000
|
·
|
Environmental Assessment
Analysis of storm water and sewerage project – Northern Gaza. 2000
|
·
|
Environmental Impact Analysis
of Gaza Transmission System Project. 2000
|
·
|
Environmental Impact
Assessment (EIA) for NORCO Asphalt Factory. 1999
|
Experience in Planning and
Design of Engineering Projects
1993-present Projects
Manager – Engineering and Management Consulting Center (EMCC)
·
Design & Supervision of
Gaza Industrial Estate Access Roads, PIEFZA, World Bank Funded Project
·
Design of Abu Baker Street –
Rafah City, Municipality of Rafah PECDAR. World Bank Funded Project
·
Design of Khalil EL Wazir
Street – Beit Hanoun City, Municipality of Beit Hanoun – PECDAR. World
Bank Funded Project
·
Design of Jamal Abdel Nasser
Street (3.5 km) – Khan Younis City, Municipality of Khan Younis – PECDAR.
World Bank Funded Project
·
Design of Water Carrier to the
Eastern Villages (18 km) – Khan Younis, PWA, Gaza
·
Neighborhood Upgrading of
El-Daraj Area – Gaza, Municipality of Gaza – PECDAR. World Bank Funded
Project
·
Neighborhood Upgrading of
El-Turkman Area – Gaza, Municipality of Gaza – PECDAR. World Bank Funded
Project
·
Design of Beit Hanoun Sewage
Pumping Station, PECDAR
·
Booster Pumping Station – Rafah
City. UNDP
·
Water Supply System in the City
Abattoir of Gaza, Phase II. Municipality of Gaza- PECDAR. World Bank
Funded Project
·
Coastal Road, Drainage and
Sewerage Project – Beach Camp, El-Fared Establishment for Engineering and
Construction.
·
Waste Water Treatment Plant,
UNRWA, El-Fared Establishment for Engineering and Construction.
·
El-Karama Towers Project –
Gaza. USAID Contract, ABB SUSSA, Inc.
·
Water supply network of
Mushtaha Tower 1, Mushtaha Housing Co.
·
Road and drainage system design
for Deir El Balah Land Fill Access Road, GTZ – Germany
6/97 to
98
Coordinator of the Technical Consulting Unit (TCU) – Municipality of Khan Younis
Prepared feasibility studies,
reports, and proposals for:
·
Development schemes for the
city.
·
Prepared projects for funding
by EC, World Bank and Khan Younis Municipality.
·
Administered the human
resources development program.
4/95 to 6/96
Technical Advisory and Follow Up Unit (TAFU) – Consultant Municipality of Gaza
Prepared feasibility studies, reports, and proposals for:
·
Development schemes for the
city zones. Prepared projects for funding by UNDP, World Bank.
·
Planning and evaluation of
small scale infrastructure projects for areas development in Gaza city,
projects funded by UNDP.
10/94 to
10/95
Ministry of Housing – Director of Training & Acting Director of Local
Governmental and Agencies Affairs
·
Responsible for coordinating
technical assistance and training programs with local and international
agencies.
·
Responsible for the preparation
of proposals to upgrade the technical and administrative capacities of the
departments of the Ministry.
·
Participated in the preparation
of "High-rise Buildings Regulations".
·
Participated in the preparation
of "Private Cooperative Housing Regulation".
·
Involved in several ministerial
committees working on the preparation of regulations related to the housing
sector.
11/93 to
10/94
Center for Engineering and Planning – Regional Director
·
Supervision of the construction
of Pumping Station #3 at Beach Camp-Gaza
·
Peer review of the design of
Sheikh Radwan storm drain reservoir and sewage flow analysis
·
Supervision of the construction
of Gaza Slaughter House (Phase II)
·
Peer review of the design of
Al-Karama Towers Project (USAID funded project)
·
Prepared proposal for the
upgrade of KhanYunis water supply system – UNDP
4/86 to 7/87
Designer Engineer, Municipality of Gaza
·
Designed several highways
including horizontal, vertical alignments, and super-elevation computations.
Designed intersections layouts and storm water collection systems. Prepared
contract documents including plans, specifications, quantity takeoffs and cost
estimate.
10/85 to 4/86 Supervisor
Engineer, Municipality of Gaza
·
Supervised the construction of
several concrete structures.
·
Supervised quality of
construction materials, process and workmanship of construction. Also,
coordinated design and process problems with consultants.
10/85 to 4/86 Private
Engineering Business, Gaza Strip
·
Designed and supervised the
construction of multistory reinforced concrete buildings.